length kitchen remodel

A kitchen remodel often requires a substantial amount of planning and work, regardless of the scale of such a project. Therefore, before starting a kitchen remodel, you should have an idea about the kitchen remodel process. For instance, you should set a kitchen remodel budget and find the length of a kitchen remodel.

A kitchen remodeling project can increase the value of your home, and in today’s hot real estate market, having a modern, clean kitchen may help spark a bidding war. However, having your kitchen out of commission for weeks at a time can be a significant inconvenience. What will be the length of a kitchen remodel, and what can you do to accomplish your remodel as quickly as possible?

Here, we will discuss the typical length of a kitchen remodel and other factors you may need to consider while remodeling a kitchen.

 

What is the Length of a Kitchen Remodel?

average length kitchen remodel

 

Most experts estimate that the average length to remodel a kitchen is anywhere from 6 to 12 weeks. However, many variables come to into play during a kitchen remodel. Major remodeling projects that change the layout of the kitchen or need electrical or plumbing work can take even longer, at an average of 3 to 6 months.

In contrast, this estimate doesn’t include the planning phase, which sometimes takes longer. Unfortunately, the planning phase doesn’t need to add to your kitchen’s time unavailable for use. The more detailed and systematic your planning, the more you can streamline the actual demolition and remodeling process.

 

Factors that Play Into The Kitchen Remodel Length

length kitchen remodel factors

The most significant factor contributing to the length of a kitchen remodel will usually be the scope of your project.

If you simply want to update a few appliances, paint your cabinets, and add a backsplash, you might be able to accomplish this over a couple of days. Still, anything extra like new countertops, cabinets, adding or removing an island, or tearing down a non-load-bearing wall can take longer.

Additional factors include:

  1. The price and availability of materials you choose, including appliances.
  2. The time needed to repair any issues or complications discovered during demolition, such as a problem with the foundation, plumbing, or flooring supports. 
  3. The ability to perform multiple parts of the project simultaneously, for instance, having one contractor reface your cabinets while another installs new flooring. 

 

A Typical Kitchen Remodel Timeline

The kitchen is usually considered a home’s focal point and is one of the rooms that houseguests generally notice first. Consequently, it is essential to ensure that your remodel is visually appealing while retaining your home’s functionality. 

The length of a kitchen remodel consists of four major phases. Here’s a closer look at each of these stages. 

 

Finding a Kitchen Remodeling Contractor

The first step before starting a kitchen remodel is to search for a contractor. It would be best if you ask the right questions before hiring a remodeling contractor. For instance, it can include their credentials, licenses, and examples of previous work to get a sense of their consistency.

Moreover, it may be a good idea to request testimonials from other clients, including references from family or friends who have enlisted a contractor’s services. 

 

Planning Design and Materials

kitchen remodel design plan

After choosing a contractor, you should plan your vision for the remodel and gather all the necessary materials for the project. This includes paint colors, tiles, lights, and remodeling permits (if required).

This can help assure your renovation work is being carried out efficiently. In case you are unsure about which color combinations and patterns to use, you can contact a design specialist for recommendations. 

If there are any materials you need to order, make sure to do so before your project is scheduled to begin.

 

Demolition and Structural Changes

Modifications within your existing walls typically take the time up to 2 months in some cases. The demolition stage includes the removal of your current flooring, appliances, and countertops. It would be helpful to label the backs of all drawers and cabinets to know where their replacements will go. If you need to remove large appliances, like a refrigerator, it is best to use a dolly.

Further, you should verify that your contractor turns off the electricity in your kitchen at the breaker box in order to avoid electrocution. 

 

Installation Of New Materials

installing kitchen backsplash timeline

Once the demolition is complete, the installation of new materials can start. It typically takes less than a week to install necessary fixtures such as plumbing, electrical, and HVAC systems. After that, you can move on to install your new floor, which can be made of one of the several types of durable materials such as ceramic tile or vinyl.

Once you have installed the kitchen flooring, you can replace your cabinets and countertops. This should take between 4 to 6 days. Meanwhile, countertops only take around 1 or 2 days to install. If your countertops need fabrication, this may take anywhere between 2 to 4 weeks, depending on the type of material.

The final aspect of your kitchen remodel includes the backsplash installation. It typically takes just 1 or 2 days, depending on the material and the complexity of your chosen design. 

 

The Final Kitchen Remodel Timeline

All in all, a kitchen remodel generally takes between 3 and 5 months on average. Furthermore, the exact length of a kitchen remodel depends on several factors. It will include the extent of the remodel, the size of your kitchen, and whether certain materials need to be custom-made. 

During the remodel, ensure frequent and effective communication with your contractor. Doing this will help ensure your remodeling project is on the right track.

 